Skip to content
Demox

What a strip-out changes

A condominium living room going from finished, with a partition wall, a dropped ceiling and tiled floor, to a bare structural shell.
One camera, locked off, from the first frame to the last: partition wall, dropped ceiling and floor finishes out, slab and services exposed. The two stills below are the two ends of it. Generated footage, not a recording of a job we have done.

Before and after

Drag the handle. That is the whole product.

A demolition portfolio is easy to fake, so this one says what it is: the pair below is generated, from the film above, and it is here to show how the page works rather than to claim a job. Real pairs go up as clients release them, shot from one fixed mark so the two frames actually match.

Generated still: the same room from the same camera position, stripped back to the structural shell with the slab and services exposed.
Generated still: a condominium living room with its partition wall, dropped ceiling and floor tiles in place.
BeforeAfter
The two ends of the film above, from one locked-off camera. Generated, not a job of ours. A documented pair replaces it the week a client releases one.

How this page will work

  • One fixed tripod mark, same lens, before and after. Matching frames or it does not go up.
  • Scope, duration and what made the job awkward. No square-foot bragging.
  • Client named only with written permission, otherwise the building type and the city.